The ‘Preferred Scheme’ is a term derived from the Scottish Government’s Guidance to Local Authorities relating to their functions under the Flood Risk Management (Scotland) Act 2009. This Act and its Regulations from 2010 to 2017 constitute the legislation under which flood protection schemes are delivered in Scotland.
The ‘Preferred Scheme’ is a defined step in the journey of advancing a scheme, and expresses the preferred combination of options to reduce flood risk, as understood at that point in time, that have been identified following an Option Appraisal Process. This approach ensures that the Project Team are able to focus work, and thus money and valuable resources, on the preferred options rather than advancing many options simultaneously that would undertake the same objective.
The ‘Preferred Scheme’ is not the legally approved Scheme: it is only a concept at a point in time. It is not approved under the legislation, and it is clearly understood by the Project Team that no part of it is definitively fixed and / or cannot evolve or indeed be replaced entirely with another option during the design. This Scheme is being advanced by an iterative engineering design process and this approach to evolving, and potentially swapping, options is normal for such an approach.
The ‘Preferred Scheme’ for Musselburgh was approved by East Lothian Council’s Cabinet in January 2020.
The ‘Preferred Scheme’ is really a concept determined at the end of Project Stage 3 (the Option Appraisal Process) and which serves as a starting point for the Outline Design (Project Stage 4). During the Outline Design stage the Project Team, through consultation with the public, businesses, and statutory stakeholders, will evolve the ‘Preferred Scheme’ into an Outline Design. It is during this process of design and consultation that considerations such as location, type of defence, and heights will be discussed and decided. Further it is during the Outline Design that the options are considered against technical, hydraulic model, environmental, financial considerations etc.
For more information, visit Preferred Scheme.